ROBAT INDUSTRY CERAMIC · DESIGN, ENGINEERING & MANUFACTURING
Robat Industry CeramicRobat Industry CeramicManufactured in IranTalk to our team فارسی
CERAMIC MATERIALS & PROCESSES

Low-pressure injection moulding: feedstock to fired component

An introduction to low-pressure injection moulding and its four main stages: feedstock preparation, injection, debinding and sintering.

A public-source technical guide. Illustrative data are not guaranteed specifications for Robat products.

A process, not a ceramic composition

LPIM injects a flowable powder–binder feedstock into a mould, followed by organic removal and sintering. The mould defines the green geometry; subsequent processing establishes the final dimensions and microstructure. Powder, binder, equipment and geometry must be specified separately.

Four main process stages

  1. Feedstock preparation: Powder and organic ingredients are mixed uniformly; particle distribution and entrapped air require control.
  2. Injection and binder solidification: The feedstock fills the mould and is demoulded after sufficient green strength develops.
  3. Debinding: Organics are removed using a method compatible with the binder system; distortion and cracking are key risks.
  4. Sintering and finishing: Densification, microstructural changes and shrinkage occur; final dimensions and properties are then checked.

This is a conceptual sequence. Combining stages in a furnace does not remove the need to control each stage.

Let’s discuss your application

The right component starts with understanding your needs.

Contact Robat